Photo a Day Challenge

Latest

Jessica & John – September 7, 2014

IMG_7445
Jessica and John after dinner Thursday night at Fudruckers.
IMG_7450
Jazmin & Jessica – sisters!

IMG_7456
My girls…….. and John!

IMG_7463
The 5 of us Sunday morning after Starbucks….

IMG_7466
Jessica & John

IMG_7467
Jessica & John

IMG_7479
My Girls !!!!

IMG_7485
Jazmin, James, and Jessica …. The 3 J’s !!!

IMG_7491

IMG_7494

IMG_7501

Star Trails – August 30, 2014

IMG_7392
We went up to Jeff and Alison’s cabin Saturday after work, for a short 24hr trip. I had volunteered to work on Monday. The cabin is up on the rim, Blue Ridge/Happy Jack area. Very clear sky. 11 minute exposure.
IMG_7423
The squirrels come right up on the deck for the sunflower seeds. They seem to be boycotting the corn.

Introducing the New GoDaddy Call Center – August 28, 2014

OK, I’m a couple of days early. Rumor has it that GoDaddy will take possession of the new Tempe Call Center on September 2, 2014. The first 100 or so C3 reps will begin working on September 10, with most everyone in the building by 9/17. The building is 98 or 99% done inside. The parking/grounds/Phase III areas are  80-85% done. Grand Opening to be announced, but should take place in October sometime, depending on schedules. The inside of the building looks pretty much the way it did last week, only a little cleaner, and more of the finishing touches are done. The outside is way different. The basketball area has all of the “sails” mounted, and looks really cool. The whole Delta 13 area is coming along. Some of the areas were getting concrete poured/finished today. Landscapers everywhere. planting/finishing up the drip irrigation/finishing the planters.  The kitchen/break area has a lot of the serving tables and stations being installed. Tables and chairs stacked up everywhere. The training room has projectors, I asked about the light from all of the windows…….. whir ….. the blackout screens are automatic. The gym floor is down, but none of the equipment is in place yet. There are HUGE TV’s everywhere. 55″-90″. Yes I said 90″ TV’s. The break room in the developers area contains taps for beer, and wine coolers…….  This is a building all of us at GoDaddy can be proud of. All of the images I shot are available HERE.

IMG_8346 IMG_8368 IMG_8372 IMG_8419 IMG_8424 IMG_8426 IMG_8435

IMG_7345 IMG_7325 IMG_7346

Call Center II – August 21, 2014

ITS ABOUT THE D E T A I L S !!!
IMG_7151
They started adding “sails” over the basketball area. Directly behind the “Delta 13” area (circles area in the foreground) You can see asphalt being “paved” for more parking areas, and trees being planted. Directly behind these areas is “Phase III”.
IMG_7191
Second floor main training area/conference center? This is the only area on the second floor using the “admin” work environments, rather than “cubicles”.
IMG_7211
My favorite area in the building so far. I’m sure the cafe will have many, many more favorite spaces, they just are not as close to being finished as this area is.
IMG_7212
The stainless steel and glass “rails” overlooking the cafe and main lobby areas are being installed, and look very classy.
IMG_7239
Directly between the building and Warner roads, the parking area is close to being finished. The “stripes” are in. The dirt areas will be planters, or 4WD parking.
IMG_7298
The first 2 “sails” are installed. I’m sure the look of this area will change daily.
IMG_7302
Tree. There are 100’s of trees staged around the property, some much larger than this one, and some smaller.
IMG_7921
While I was on the roof, a flock of pigeons flew over.
IMG_7922
This piece of equipment “recycles” air from the building that has already been cooled off, and re-cools it, using less energy, than cooling off ambient outside air. There are several of these units on the roof.
IMG_8043
Looking down from the second floor into the lobby, at the front desk furniture, covered to protect it from the other construction going on. I’m guessing its walnut.
IMG_8048
Workers installing the stainless steel and glass “rails” on the second floor, in the main lobby area. The lights here are different than anywhere else in the building.
IMG_8116
Of the questions employees ask me, this is the gym area, and the rolls of material are the rubbery sub flooring material, and the “parquet” floor is in an area that can be separated by a “moving wall”. Last week this area was still being used by several of the trades for tool/supply storage.
IMG_8118
Gym area with a parquet floor.
IMG_7123
View from the roof, looking south out over the main lobby entrance. You can see the steel beams have been set for the covered parking areas, and lots of planters.
IMG_7132
Southwest corner of same parking lot.

IMG_7134
I’ll say it again, I love being on the roof…..
IMG_7157 IMG_7214
The floor in the cafe…. this pattern continues out into “Delta 13” the circles area just outside the cafe and main lobby entrance.
IMG_7848
Some of the larger trees staged in the parking lot.
IMG_7859
Stripes.
IMG_7891

IMG_8012
Each of the “break” areas have a different look and feel, and all are very open and inviting, with lots of amenities.
IMG_8021 IMG_8052

IMG_8067
Its the D E T A I L S that will make this building unique to GoDaddy.
IMG_8068 IMG_8131
Training rooms on the first floor north side.
IMG_8150
Lots of seating areas in the cafe…. booths are being assembled behind this long bench seating. Also lots of raised platform areas for seating as well.
IMG_8152 IMG_8157 IMG_8202 IMG_8286 IMG_8332
Southeast corner of the building also has a neon GoDaddy sign on it that will be visible from Warner and the 101. S W E E T !
IMG_8333
All 625 images shot 8/21/2014 are available here, and as always all images were shot with the Canon 5D Mark II, EF 17-40 F4 L lens, or the EF 24-105 F4 L IS lens. Most inside shots had help from the Canon Speedlight 580EX II camera mounted.